Deck Joist Hanging Options Home Improvement Stack Exchange The surface height of my deck will be ~8' 8" above grade and there is a cement patio under the deck. in dca6 page 11, it shows that "joist on beam" and "joist hung from beam" are allowed. i'm trying to preserve as much headroom on the patio as possible and have chosen to hang the joists. Or, torsion box with diagonal braces to the existing deck. i'd like to do the diagonal braces attached to the existing deck rim joist but i don't know if there is too much overhang? from bottom of deck rim joist to top of the deck where the box would sit on is 10.5" so the diagonal brace goes out and supports 10.5" horizontally.

Deck Joist Hanging Options Home Improvement Stack Exchange 2 i have a deck joist hanger or two that i was considering replacing in place if possible. the issue is this deck is 20 ' in the air on uneven ground so supporting the joist from underneath before removing the hanger isn't that feasible. I'm planning a deck and to minimize stair length i don't want the top tread to be at the same level as the deck. so that means hanging the stringer below the 2x10 rim board. i'm talking about the piece of 2x10 which is attached at the end of the main joists, perpendicular to the actual joists forgot the right term for it. is it rim joist?. That makes the joists hanging near the house but laying on top of the 3 further beams. but i have a question about the right red circle area. how should it be connected to the post? option a: can i nail or hang a "beam" to "post"? option b: or do i have to make the post closer now (instead of 5 feet spacing) and that part is an overhang?. I see a couple of options: so long as the fasteners (ledger to wall) aren't in the way of the joist hangers, have the ledger joint right there and use a standard double joist hanger. make your ledger out of a 12' and a 10' board, thus moving the joint between ledger pieces away from the doubled joist and eliminating the problem all together.

Deck Joist Hanging Options Home Improvement Stack Exchange That makes the joists hanging near the house but laying on top of the 3 further beams. but i have a question about the right red circle area. how should it be connected to the post? option a: can i nail or hang a "beam" to "post"? option b: or do i have to make the post closer now (instead of 5 feet spacing) and that part is an overhang?. I see a couple of options: so long as the fasteners (ledger to wall) aren't in the way of the joist hangers, have the ledger joint right there and use a standard double joist hanger. make your ledger out of a 12' and a 10' board, thus moving the joint between ledger pieces away from the doubled joist and eliminating the problem all together. Inspecting the deck, my concern is that there are no joist hangers. the joists are nailed into the ledger on the house, and there is a 2x2 underneath for support. If you make a 12'x 14' floor assembly out of 2x2 joists with rim joists and this is for the most part sitting on the ground, you could shim with composite shim or make your own from decking offcuts. another option is you could use a non shrink structural grout in any space between the joist and the slab and use get a mortar bag to apply it.

Deck Joist Hanging Options Home Improvement Stack Exchange Inspecting the deck, my concern is that there are no joist hangers. the joists are nailed into the ledger on the house, and there is a 2x2 underneath for support. If you make a 12'x 14' floor assembly out of 2x2 joists with rim joists and this is for the most part sitting on the ground, you could shim with composite shim or make your own from decking offcuts. another option is you could use a non shrink structural grout in any space between the joist and the slab and use get a mortar bag to apply it.

How To Replace Deck Joist Hanger In Place Home Improvement Stack

How To Replace Deck Joist Hanger In Place Home Improvement Stack